• January 22, 2026

Cameroon sugarcane strike turns violent over wages

Over 150 hectares of sugarcane fields have been destroyed in Cameroon due to violent clashes between workers at the Société Sucrière du Cameroun (SOSUCAM) and police. The unrest, which erupted earlier …

FIFA suspends Congolese Football Federation

FIFA has announced the immediate suspension of the Congolese Football Federation (FECOFOOT), following escalating tensions between the Ministry of Sports and the football body. The dispute, which has been ongoing for …

Judge halts Trump’s effort to dismantle USAID

A federal judge has delivered a major blow to President Donald Trump and his ally, billionaire Elon Musk, halting plans to pull thousands of staffers from the U.S. Agency for International …

South Africans are experiencing, in the middle of winter, the country’s most drastic outages since 2019.

The state-owned electricity utility, Eskom, will implement stage 6 of load shedding between 4 and 10 pm on Wednesday.

Stage 6 means that power cuts could be increased to 6,000 MW. South Africans expect to endure on a rotational basis multiple cuts a day – each lasting between two and four hours – as they try to use electricity sparingly.

Breakdown of power stations and strikes

Persistent electricity disruptions partly due to the breakdown of power stations have affected South Africa’s economy. This time, the state Enterprises Minister cited ongoing strikes over wages and intimidation of workers willing to attend to their duties as the main reasons behind the current situation. “Eskom is in this position because of the industrial action which has meant that in many power stations up to 90% of the staff could not attend to the duties… because of intimidation,” Pravin Gordhan told a media briefing.

In Eskom’s latest statement, the company confirms to the public that load shedding could last until Friday and shall be reduced to stage 4 and 2.

South Africans are urged to use electricity sparingly in order to help prevent nationwide blackouts. The public utility insists load shedding is implemented only as a last resort.

Leave a Reply

Your email address will not be published. Required fields are marked *